7 Interim Meetings

  • Application-Layer Traffic Optimization - 2010-06-16
  • Data for Reachability of Inter/tra-NetworK SIP - 2010-05-05
  • Multiple AoR reachabiliTy InformatioN Indication - 2010-06-16
  • Open Authentication Protocol - 2010-05-20
  • RADIUS EXTensions - 2010-07-12
  • Routing Over Low power and Lossy networks - 2010-06-16
  • SIP Recording - 2010-06-22
  • SIP Overload Control - 2010-06-29