| Done | | Accept base protocol specification as a WG document |
| Done | | Accept problem statement and applicability as a WG work item |
| Done | | Start work with routing area WG(s) to undertake TRILL
extensions |
| Done | | Accept architecture document as a WG work item |
| Done | | Accept routing protocol requirements as a WG work item |
| Done | | Choose routing protocol(s) that can meet the requirements |
| Done | | Submit problem statement and applicability to IESG for
Informational RFC |
| Done | | Submit base protocol specification to IEEE/IETF expert review |
| Done | | Base protocol specification submitted to the IESG for
publication as a Proposed Standard RFC |
| Done | | First draft showing what is needed for MIB |
| Jul 2010 | | Re-charter or shut down the WG |